Posts

METHOD STATEMENT FOR RAILING FIXING

Image
searchfeed METHOD STATEMENT FOR RAILING FIXING INTRODUCTION The scope of this method statement is to define the procedure that will be followed for Railing fixing. OBJECT ·        Approved Railing Drawings. ·        Detailed section of railing.(Balcony/Stair) MATERIAL Stair/balcony Railing, welding rod, Plumb bob, Measuring tape, MS plate of 100x50 mm  for stair railing , mason thread, anchor fastener (100X8mm), Welding machine, Hammer drill Machine, Safety Shield, Grinder, hammer. HEALTH AND SAFTEY PROVISION 1.    The work place is to be free from all kind of debris. 2.    To check electrical socket for work. 3.    Any kind of cable/wire is to be covered with flexible pipe and no naked wire is to be seen. 4.    Use welding glass during welding. PROCEDURE Stair railing fixing 1.     If the tread is of 300mm, after 100mm from the starting of tread MS plate of 100X50 is to be fixed by anchor fastener of 100 X 8 as shown in the drawing. 2.     S

Door Shutter AND FIXTURE FITTING WORKS

Image
METHOD STATEMENT FOR Door Shutter AND FIXTURE FITTING WORKS INTRODUCTION This method statement describes the activities for door shutter fixing works to use on site. The purpose of this procedure is to provide guideline to carry out the door shutter fixing work at site and to ensure that proper quality control and documentation are maintained at site. OBJECT a.                    GFC Drawing. b.                    Technical Specification MATERIAL           Door Shutter, Door fittings, Screws, Wood Primer, Enamel Paint EQUIPMENTS AND TOOLS       Right angle, Plumb, Drill machine, Screw driver (four head and minus head), marking         pencil, Light weight Hammer, Planer, saw, chisel, File, HEALTH AND SAFETY PROVISIONS   1.     Proper stacking of material : i)       Door shutter should be stacked horizontally over three wooden channel (4”X4” or 3”X5”) placed over flat surface. ii)      Unloading and Storage shall be performed carefully so

HOW TO DO MASONRY OF BLOCK-WORK

Image
HOW TO DO MASONRY  OF BLOCK-WORK INTRODUCTION / SCOPE This method statement covers the requirements, equipments and procedures to be used for AAC block work. REFERENCE Following documents shall be considered as reference for execution of the job: a)       Architectural GFC drawings provided by consultant. b)       Site instructions. c)       Checklist for Block work MATERIAL AAC Block, Stone dust, PPC Cement, Water, Steel Bars, Aggregate, Chicken wire mesh. APPARATUS / EQUIPMENT M ixer machine, Measuring box, Right angle, Grooving tools, Hand saw, Trowel, Plumb, Bucket, Thread, Scraper, Brick Hammer, Spirit Level or Bubble Tube, Steel Tape, Aluminum fanti ,                           HEALTH AND SAFETY PROVISION a)       The work place is to be free from all kind of debris. b)       Specific safety measures are to be followed as applicable. c)       All working platforms are to be in