METHOD STATEMENT FOR BRICKWORK

Image
METHOD STATEMENT FOR BRICKWORK 1.   INTRODUCTION / SCOPE Ø   This method statement covers the requirements, equipments and procedures to be used for brickwork. 2.   OBJECT / PARAMETER Ø   Following documents shall be considered as reference for execution of the job: a.    Architectural GFC drawings provided by consultant. b.    Site instructions. 3.   MATERIALS Ø   Bricks, Cement, Stone Dust/River Sand, Water, 6mm dia. MS bars. 4.   PRINCIPLE Ø   An assemblage of bricks properly bounded together in mortar is called brickwork. In normal brickwork, the bricks are arranged and bedded in mortar in such a manner as to form a homogeneous mass of the structure. 5.   APPARATUS / EQUIPMENT Ø   Kanni, Plumb, Bucket, Thread, Scraper, Brick Hammer, Spirit Level or Bubble Tube, Right Angle, Steel Tape, Fanti. 6.   HEALTH AND SAFETY PROVISION a.    The work place is to be free from all kind of debris. b.    Specific safety measures are to be followed as

METHOD STATEMENT FOR ROAD WORK

METHOD STATEMENT FOR ROAD WORK INTRODUCTION This method statement describes the activities to carry out Road works as per specifications. OBJECTIVE      Following documents shall be considered as reference for execution of the job: •       Approved layout of roads. •       Levels of Roads. •       Location of speed breakers. 1)     Paver Road MATERIAL         GSB, WMM material, Concrete paver (M 30 grade, 60mm thick), Sand,                cement, stone dust. APPARATUS/EQUIPMENT: Cutting machine, Plate compactor, Level pipe, nylon thread, Trowel, Measuring Tape, Aluminium phanti, Rubber Hammer (For setting pavers), Vibro roller, Auto level. HEALTH AND SAFETY PROVISION: ·          Ensure Protection equipment, dust mask and hand protection gloves are being used. ·          Engineers and supervisors to ensure safety measures are being followed. PREPARATORY WORK: ·          Identify all work areas that would be needed for road work . ·          Start